◎Highlight: The Company is the largest mined-zinc producer in China, with significant capacity and profitability in low grade zinc (lead) ore development. During the reporting period, phase 4 of Zijin Zinc’s flotation processing system commenced commissioning and trial production.
◎Resources:Zinc resources were 9.89 million tonnes, of which the proved and probable reserves were 4.2 million tonnes; lead resources were 1.3 million tonnes, of which the proved and probable reserves were 604,200 tonnes.
◎Production: The Group produced 720,776 tonnes of zinc, representing an increase of 0.26% compared with the same period last year (same period last year: 718,883 tonnes).
Among which, the Group produced 402,321 tonnes of mined zinc in concentrate, representing an increase of 1.48% compared with the same period last year (same period last year: 396,443 tonnes);
318,454 tonnes of zinc ingots were produced from smelters, representing a decrease of 1.24% compared with the same period last year (same period last year: 322,440 tonnes).
39,661 tonnes of lead in concentrate were produced, representing an increase of 4.53% compared with the same period last year (same period last year: 37,942 tonnes).
◎Costs: During the reporting period, the unit cost of sales of mine-produced zinc was RMB8,017/tonne, representing an increase of 8.80% compared with the same period last year (same period last year: RMB7,369/tonne).
◎Contribution: Sales income from the zinc (lead) business represented 4.55% (after elimination) of the operating income during the reporting period. Gross profit generated from zinc (lead) products represented 7.68% of the gross profit of the Group.
Major zinc/lead mines or enterprises |
Name |
Ownership |
Consolidated-Mined zinc (kt) |
Consolidated-Mined lead (kt) |
Consolidated-Mined Zinc and lead (kt) |
Attributable-Mined Zinc and lead (kt) |
Zijin Zinc |
100% |
140.76 |
20.23 |
160.99 |
160.99 |
|
Bisha, Eritrea |
55% |
120.53 |
- |
120.53 |
66.29 |
|
Longxing, Russia |
70% |
85.38 |
6.22 |
91.6 |
64.12 |
|
Urad Rear Banner Zijin |
95% |
45.30 |
9.98 |
55.29 |
52.52 |
|
Ashele Copper Mine |
51% |
9.42 |
- |
9.42 |
4.80 |
|
Other sites |
0.93 |
3.23 |
3.40 |
3.90 |
||
Total |
402.32 |
39.66 |
441.98 |
352.63 |
Major zinc (lead) refineries |
Name |
Ownership |
Consolidated-Zinc bullion (kt) |
Attributable-Zinc bullion (kt) |
Bayannur Zijin |
87% |
213.35 |
186.04 |
|
Xinjiang Zijin Non-ferrous |
100% |
105.10 |
105.10 |
|
Total |
318.45 |
291.15 |